The short answer
- LADWP is city-owned, so the state's NEM 3.0 rules for SCE, PG&E and SDG&E do not apply to it.
- LADWP still credits the extra solar power you send to the grid, which makes panels-only systems work well for many homes.
- You still need LADWP approval (interconnection) before turning a system on. Your installer handles that paperwork.
Most of what you read online about California solar is written for SCE and PG&E customers, who moved to the state's NEM 3.0 rules. If you are on LADWP, a lot of that does not apply to you.
What net metering means
When your panels make more power than your home is using, usually midday, the extra goes out to the grid. Net metering means the utility credits you for that power, and those credits offset power you pull from the grid at night.
Why NEM 3.0 does not apply to LADWP
NEM 3.0 is a California Public Utilities Commission policy. It covers investor-owned utilities like SCE, PG&E and SDG&E, and it cut the credit those customers get for exported solar to a few cents per kWh.
LADWP is owned by the City of Los Angeles and sets its own rules. It kept net metering, so extra solar power still earns a much more valuable credit than it would under NEM 3.0.
How LADWP credits your solar
Your solar first powers your home in real time. Anything extra flows to the grid and is credited against what you use later. Over the billing cycle, LADWP nets the two. The practical result: well-sized systems can offset a large share of a home's bill, including the expensive Tier 3 usage.
Do you need a battery?
For SCE customers on NEM 3.0, a battery is often needed to make the numbers work. For LADWP homes, a panels-only system is often the best payback. A battery mainly adds backup power during outages. We show both options side by side so you can decide.
How to get set up
- Bill review: look at 12 months of usage to size the system. We size about 10% above your usage.
- Design and quote: compare written quotes from licensed installers.
- Permits and LADWP interconnection: the paperwork is handled for you.
- Inspection and permission to operate: LADWP approves the system and you turn it on.
Want to see what this looks like for your home? Try the LADWP savings calculator.
Common questions
Is LADWP on NEM 3.0?
No. NEM 3.0 applies to investor-owned utilities like SCE, PG&E and SDG&E. LADWP is city-owned and still offers net metering.
Do LADWP customers need a battery with solar?
Usually not for savings. Panels-only systems often have the best payback on LADWP; a battery is mainly for backup during outages.
Who handles the LADWP solar application?
Your installer submits the interconnection paperwork. MyPowerCo stays involved as your point of contact until LADWP approves the system.
See your own numbers
Slide your bill into our 2-minute calculator, or have a MyPowerCo advisor review your bill for free. No pressure.
Try the savings calculator Get a free bill review
MyPowerCo is an independent solar company and is not affiliated with LADWP, SCE or any government agency.