Family-owned solar for Los Angeles homeowners · CSLB HIS Reg. #144166 (323) 457-5123 · Mon–Sat, 7am–9pm
How solar works

From sunlight on your roof to power in your kitchen.

A home solar system has four main parts and one big rule from your utility. Once you understand both, you can judge any solar quote yourself.

Typical summer day: solar production peaks at midday while household use peaks in the evening 12a6a12p6p12a Solar production Home use
Solar peaks at noon. Your family uses the most power from 4–9pm, when utility rates are highest. Under NEM 3.0, a battery moves midday sunshine into that evening window.

The four parts of a home solar system

1. Solar panels

Panels on your roof turn sunlight into direct-current (DC) electricity. Modern residential panels are around 400–450 watts each; a typical California home needs 15 to 22 of them.

2. Inverters

Your home runs on alternating current (AC). Microinverters (one per panel) or a central string inverter convert the DC power so your outlets can use it.

3. Battery storage

A home battery stores extra midday solar for the evening and keeps essential circuits powered during an outage.

4. Monitoring & your utility meter

An app shows what your panels produce each hour. A bi-directional meter tracks power you pull from and send to the grid.

The utility rule that changes everything

NEM 3.0 in one minute

California's Net Billing Tariff (often called NEM 3.0) applies to new solar customers of PG&E, SCE and SDG&E. It was upheld in court and the California Supreme Court declined review in June 2026, so it's the rule going forward.

Power you use yourself

Every kWh your home uses straight from your panels or battery saves you the full retail rate, roughly 35–45¢.

Power you send back

Exported power earns an hourly credit that averages only about 4¢ per kWh, higher on some summer evenings.

What that means

Design for self-use. A right-sized system with a battery usually beats a big system that exports most of its power.

Read our full NEM 3.0 explainer → · LADWP, SMUD and other municipal utilities have their own rules. Ask us about yours.

Our process

What working with MyPowerCo looks like

We compare proposals from multiple vetted, licensed installers, help you pick the best one, and manage the project for you from start to finish.

  1. Consultation

    Share 12 months of bills (or connect your utility account). We review usage, roof, shade and your electrical panel.

    Day 1
  2. Design & quote

    You get a roof layout, equipment list, production estimate and an itemized price for panels-only and panels-plus-battery.

    2–5 days
  3. Site survey

    The installer's technician confirms roof condition, rafters, attic and panel. If your roof needs work first, we'll tell you.

    Week 1–2
  4. Permits & install

    Your installer files permits and the utility application, then installs in one to two days. We keep everything on track.

    Week 2–8
  5. Inspection & PTO

    The city inspects, the utility grants permission to operate, and we walk you through your app.

    Week 6–12
Is my home a good fit?

Good signs your home is ready for solar

  • Your electric bill averages $150 a month or more
  • You have south-, west- or east-facing roof space with little afternoon shade
  • Your roof has at least 10 years of life left (or you're planning to replace it anyway)
  • You plan to stay in your home five years or more
  • You're adding an EV, heat pump or pool, or you want backup power

Missing one or two? Solar may still make sense. Ground mounts, carports and battery-only systems are options. Ask us.

Free · No pressure · No obligation

See what your roof could produce.

Send us your last electric bill. We'll design a system for your home, show you the real numbers with and without a battery, and give you a written quote you can compare against anyone else's.